•   Info@gbs.com.vn
  •   Call Us: (+84-28) 3500 2828

 

Practice Area

Before starting construction work, the Construction License is essential for every owner. GBS provides the service of consulting and carrying out the procedures to be issued Construction License as follows:

Procedures

  1. Provincial People's Committee authorizes the Department of Construction to issue construction license for the constructions of special grade, grade I and grade II; religious constructions, historical – cultural constructions, public monuments, monumental frescos of administrative boundaries under province’s management, constructions on routes or main streets in urban; constructions of FDI projects; constructions of the projects and other constructions by the provincial People's Committee regulations.
  2. District People's Committee issue construction license for the remaining constructions and individual houses in urban areas of administrative boundaries under district’s management, excepting those specified in paragraph 1 of this Article.
  3. Commune People's Committee issue construction license for the individual houses in rural areas of administrative boundaries under commune’s management.

 

Dossiers shall be made in 3 sets.

Requirement Documents

  1. Application form.
  2. A certified copy of one of the papers related to land use rights, with the extract of land map or the actual measurement determining the boundaries of plot of land.
  3. Business registration certificate (if the construction of the enterprise).
  4. Two sets of design drawing, each set includes: 
  • Drawing of constructions plan on land lot with a scale of 1/50 - 1/500 together with the outline of constructions location;
  • Plan drawing of storeys, elevation and main section of the constructions with a scale of 1/50 - 1/200.
  • Drawing of foundation plan with a scale of 1/50 - 1/200 and foundation section with a scale of 1/50 together with the connection diagram with the system of rainwater drainage, waste-water, water and power supply and communication with a scale of 11/50 - 1/200.

 

Time Frame

  • Not exceeding 20 working days for constructions;
  • 15 working days for individual houses in urban areas;
  • 10 working days for individual houses in rural areas, from the date receiving valid dossier.

 

Any support you may need, please contact us today via:

 

  • Email/ Google hangouts: This email address is being protected from spambots. You need JavaScript enabled to view it.
  • iMessage | SMS | Whatsapp | Viber | Call: +84903189033

 

GBS is one of the best business law firms in Vietnam with a network South East Asia, Middle East, Japan, HongKong, Malta and Poland.

Twitter Feed

GBS - Over the past decade, the social media market in Vietnam has been booming and shows no signs of slowing... https://t.co/vcG41Rw1EF
GBS - The Vietnamese Finance Ministry has proposed rising the VAT rate from 10% to 12%. Read more at:... https://t.co/eDpY9GlbZl
Đầu tư lấy Quốc tịch Malta chính thức được tiếp thị tại Việt Nam... https://t.co/K1QdVH9V5V
Follow GBS on Twitter

Contact Info

GBS Co., Ltd
8th Floor , Trade Centre Building, 135A Pasteur Str, Ward 6, Dist. 3, Ho Chi Minh City, Vietnam

Hotline | Whatsapp | Viber | iMessage: (+84) 903189033

This email address is being protected from spambots. You need JavaScript enabled to view it.

(+84 - 28) 3500 2828

 

8.00 am to 5.00 pm